Cheers for the advice guys.
The current plan was to run it through the new floor. The floor would be a new DPM, concrete, Insulation, Underfloor heating, Screed, Tiles.
I'd guess there were two options then, both options would have the pipe running through a second bigger dia pipe
1)...