I've pretty much got this installed save for reboarding the studwork and mortoring in the pipes in the wall, but want to check a few things before I do that. I've a gravity fed system (tank in loft, HW cyclinder at first floor level) with twin impellor pump fed with 22mm into 15mm flexi's, with...