Thank you for your reply. Very helpful and much appreciated.
A structural engineer has been employed to provide calculations however, they have not stated that a percolation test should be carried out. BC has requested that this be done.
Should the structural engineer have stated this in the...
Hi, can anyone help confirm who is responsible for ensuring that a percolation test is carried out following a Building Control inspection? Should this be included in the Architects' drawings to be done or down to the Builder?