Not sure exactly what you mean by oversite slab. The old floor consisted of (top to bottom):
50 mm screed,
100-150mm concrete,
DPM,
approx 200 mm loose stones,
stony compacted earth (?) I havn't dug below this, level of the top of the footings.
The new floor was going to consist of (top to...