Recent content by goconnor573

  1. goconnor573

    Sagging ceilings (35mm at worst), sister joists advice

    Aye a couple were still sagging after lime and lath removed. Ended up screwing with M8 80mm coach screws and glueing with gripfill (construction adhesive) 75mm x 38mm x 2.4 and then 100mm x 38mm for the ends as 30/35mm was too close to centre line for me. Was a random bit were the chimney was...
  2. goconnor573

    Sagging ceilings (35mm at worst), sister joists advice

    Yeah agreed, apologies don't have any on my phone at the moment. Room is 3m by 2.3m joists running the 3m length with no noggins. Ceiling is sagging 35mm at worst point, not all are that low. Looking more at it and think coach screws would be better than what i was originally using. M8 by 70...
  3. goconnor573

    Sagging ceilings (35mm at worst), sister joists advice

    Hello. 2 storey 1920 mid terrace and the bedroom ceiling upstairs was lime and lath was mostly loose so pulled it down and joists are sagging in spots and out of level in general. The joists are 3x1.5 approx and the room is 3m x 2.3m with joists running the 3m length. They have sagged in the...
  4. goconnor573

    Safe chase width for new consumer unit/wiring

    Hello all. Getting my 1920 2 storey mid terrace with 4 inch solid red brick walls rewired which means alot of new cable and new consumer unit. The consumer unit is mounted on an internal load bearing wall in the corner with the front external wall. All cables are running vertically from the...
  5. goconnor573

    1920 mid terrace (no cavity), injected dpc, insulated plasterboard condensation?

    Perfect One last one. Since injected dpc has been done, damp fellas said plasterer shouldn't go below the holes as below will be the damp line (if water does rise) which makes sense. I'd assume same principle for the insulation? Or since it's foil back can go below the injection holes? Best...
  6. goconnor573

    1920 mid terrace (no cavity), injected dpc, insulated plasterboard condensation?

    So to clarify the process would be. Plasterboard glue and mechanical fixings for PIR to the brick walls. Foil tape cut ends to ensure tight fit. I'd also assume water down PVA to clear the duct for the bricks. Then for the plasterboard to the pir just glue? Or glue PIR to wall then use glue and...
  7. goconnor573

    1920 mid terrace (no cavity), injected dpc, insulated plasterboard condensation?

    Cheers. For the window revales should I get thinner insulation or will that lose be negligible? Aye thought direct would be better option
  8. goconnor573

    1920 mid terrace (no cavity), injected dpc, insulated plasterboard condensation?

    Hello all Apologies read several threads on this but still not 100% my scenario. 1920s mid terrace with no cavity Injected dpc done (plaster been chipped back to brick approx 1m above floor level) Planning to put insulated plasterboard on both outside walls (front and rear) 2500 ceiling height...
Back
Top