    Digging a 2.5. Meter hole for a soak away

    Thanks for all your replies, negative and positive. I have completed the digging by hand without incident and shored the pit using OSb and timber battens. Now have to do a soil infiltration test for the building control officer to see if I need to use crates or can use hardcore. I'll keep...
  2. G

    Digging a 2.5. Meter hole for a soak away

    Hi all I am extending my property and as such need to dig a new soak away. The only position for this is on ground 1 meter higher then the planned building site and as such have been told I need to dif down 2.5 meters. This is not a problems such and I am already 1.5 meters down but I am...