Recent content by Hermanowl

  1. H

    Mislead about building control

    The orangery is 3m x 6.9m and IS connected to the main heating system but can be independently controlled (rad stats)? Where does that leave me?
  2. H

    Mislead about building control

    Building started in May this year? Sorry, trying to get my head around what uve put?! Does that mean it does or doesnt need build regs??!!
  3. H

    Mislead about building control

    I have got external quality doors from the kitchen into the orangery, but the builder told me I still needed building regs because the total amount of glass in the orangery is less than 50% of the total size so it does not fall under conservatory rules?
  4. H

    Mislead about building control

    and yes it did need planning and build regs due to size, drop at neighbours side and not having over a certain percentage glazed.
  5. H

    Mislead about building control

    Got a written contract, but it doesnt say anything about planning permission or build regs........I realise that I have dropped a major clanger there but they sorted planning permission so I didnt feel any need at the beggining to suspect they wouldnt sort build regs. If anything they were...
  6. H

    Mislead about building control

    Hi All, I have recently had an orangery built on the back of my house which required planning permission and building control. The builder I chose told me that the price included fees for both and that they would deal with it all. The orangery is basically built now and i owe the builder...
Back
Top