Ok, so it seems my options are:
#1 Book the charging point installation and have them install the one-way board.
Pros: Single job, Cheapest option (£65)
Cons: No space for future expansion, Two boxes on wall
#2 Have a sparky fit a 2nd CU and then get the charging point installed once done...
Yes, I was thinking more of the labour costs. For the single circuit box I can get it installed at the same time as the charging point and so I assumed the £65 extra was mostly for the cost of parts as there would only be a small extra amount of labour. Whereas if I wanted a larger additional CU...
Pic of CU attached. Don't have a pic of meter etc but can add later if that's useful
BTW Quote for the one-way board was £65 ontop of standard installation. I assume a new CU would be significantly more than that?
We've just bought a plug-in car and are looking to get a charging point fitted. This will need a new connection to the consumer unit, but ours is already full.