Hi all,
I'm doing the groundworks for my rear single story extension and just trying to get my head around the oversite preparation.
I've measured down from the existing floor level allowing for 150mm hardcore, 50mm sand, 75mm insulation, 100mm concrete and 60mm screed. When I do this, the...