Thanks cotswoldbuilders - you predicted correctedly.
Also mentioned previously was that the works were undertaken during period of rain. I called the builder prior to the work starting to ask him how he intended to go about it given rain forecast and he assured me it would all be weather...
here, another close up picture of the finishing beauty...
...and 48 hrs between 2 resin applications (because one day was rainy - worrying as the edges were all unprotected and got very wet)
Also ordinary ply used..
Thanks Dilly, this is how he is finishing the edgings off - yes the old felt all still there and... is it taped on and leaded across?? I'm really not sure what exactly has been done??
And the finishing for the roof windows - it seems that they covered over the existing felt.
Do these...
I know he didn't take much felt off - if at all- even though he said he took the top layer off because 2 hrs into the first day of work he started laying down furring...! I'm just worried that there might be cracks months down the line. Potentially due to movement as I have a roof on top of an...
thanks surrey, the quote said to strip existing felt roof covering that is on the flat roof area which is covering the existing asphalt roof. so I assumed he would strip to joist. Or am i reading it wrong?
The quote also says to Lay furring pieces from front to rear elevation of the flat roof...
We currently have an old Felt roof on our house which is dipping in places and decided to replace the roof with a GRP roof. We hired a roofer/builder who quoted to strip existing felt, re-fir, re-deck, and install GRP system to the entire flats roof.
When looking at the work done so far, I...