Have read on here lots of comments on the poor reliability of the Suprima L due to PCB failures etc. The design of this boiler puts all the electrics right next to the heat exchanger which may not have helped matters. The current Suprima HE looks to be a better design with the electricals moved...
Thanks guys. I guess they are referring to something like a wall; I don't think a wall cupboard within the 610 is a major problem as it could always be removed !
The Suprima boiler is 600X400x260. Can someone explain why with a total depth of 260 the service clearance is an additional 610. Presently have a Netaheat hanging on the wall where new boiler will go and its huge in comparison and has no problems with clearances for servicing. Am I missing the...