My architect is proposing a lintel and void to avoid concreting over services like a bridge he said...have requested him to get this...
-
P
Best to keep them seperate. Would also block the ends up with somthing like sponge & it should be enough to keep concrete out, but easey...
-
P
I called cadent. They wanted me to book a service enng appointment to assess whether sleeving is an option. I am being told it is not a...
-
P
Thank you collectors. Is sleeving this way best option.
I had electric cable next to gas. I presume both need individual sleeve.
-
P
you cannot build over an existing service . your builders and architect should both know this .
Should be moved and will be cut off...
-
P
As I mentioned what is the solution until cut off. I will not be able to wait until Jan when cut off is planned.
-
P
If its a 25mm pipe? get a lenth of 4" soil pipe & cut it to the width of th trench. Then cut a 30mm slot down the lenth & slide it over...
-
P
That’s why I tagged Gas112. Very knowledgeable, far more than myself and iirc, he has worked for Cadent or similar.
-
P
@gas112 will likely know, but have you spoken to Cadent about it? I think it needs to be protected from corrosion, and oversleeving...
-
P
I called cadent. I need to call again tmrw.But i want my architect to liaise with them and add specification in his drawings.
I am...
-
P
Builders hand excavated footing to bring property line forward.PP approved. BC plan is to pour concrete 700mm in trench 1m deep.
I...