Recent content by Petemcc

  1. P

    Damp proof course

    Irrespective of whether there are slabs or not, the builder should have put the dpc in a minimum of 150mm above FINISHED ground level. As they laid the slabs, they should have known the ground level. I'd go back to them and ask for an aco to be installed or a chemical dpc injected. The building...
Back
Top