Thanks for the replies. Currently in a bit of a dsipute with the builder as my flooring guy came and said he needed to do another DMP prior to screeding, I don't want to pay twice for the 1 job. Does it routinely take two coats or should it be a 1 coat job? Also, those tiles are lino.
Hi,
Looking for some advice. Having some treatment done on a concrete floor - was showing signs of damp. The builder had put down a surface DPC (see image) which to me doesn't look great. Any thoughts from anyone would be appreciated.
Hi all - first time poster :)
I have just moved in to a 1930s house and a I am starting to decorate. In the main bedroom, one wall was covered with paper which we have stripped and washed down. What was left on the wall was a white covering (emulsion I think!) on top of the plaster (down to...