can anyone help with the following:
can this plan be run by a single port(tempus one) controller.
the wiring at the controller is N-E-L IN LIVE LINK TO (1) boiler live and two feeds to the boiler area Hw and Ch. i have a wiring diagram which shows a hw off connection, i dont have a wire at the...