I can't see why it would cost £2k to spec this up. Its not Buckingham palace!
No way am I gonna pay that kind of money. A few hundred £ maybe but £2k, no way
This is a DIY forum so let's see if I can do much of it myself with your help
I'm told:
"an SLE300 plus would give 640 litres per 10 mins @ 45c. Maximum usable input from the boiler is 68kw & the initial heat up time from 10c to 85c is only 22 mins ,the recovery time is almost instant so will not run out of DHW and down time in heating mode will be very short.
Thanks for your contribution guys and I would like to save £2k
Ive seen good feedback on this forum for Atag, so how about if i go for ATAG Q-Series Q60S Condensing Gas System Boiler and say two 300L cylinders, say ACV SLE300 (tank within tank) which are supposed to replenish quickly. I...
I'm looking for a new system to provide heating and hot water for a 15-bed HMO (all rooms are ensuite) in a 5 storey building, 11m x 8m footprint (440m2).
CH: approx 20 rads + 15 towel rads (150,000 BTU approx)
DHW: 15 showers + kitchen
Assuming, no more than 10 people will shower at any...