Recent content by Spikes Mavic

  1. S

    Main Bonding

    Completed 10mm from MET to garage .
  2. S

    Main Bonding

    Am doing the 2 green wires, and tks for making it clear, it was getting a bit messy :)
  3. S

    Main Bonding

    Your attachment is what I am doing !
  4. S

    Main Bonding

    The only thing in question now, is where to fit the 10mm bonding to the gas pipe in the house, I can't fit a bond to the gas pipe has it enters the house, it comes in under the floor boards, so was asking now if bonding to the gas feed to the boiler will be ok !
  5. S

    Main Bonding

    The boiler gas pipework is the only place to fit a bond inside the house , it comes into the house under the floor boards and up into the kitchen to the boiler
  6. S

    Main Bonding

    I thought that the gas pipework has to be bonded has it enters the house , has well has the meter in the garage !
  7. S

    Main Bonding

    Would like something more robust for the steel pipework !
  8. S

    Main Bonding

    Thanks Guys n Gals for your inputs on this. This is what I am going (doing) to do: 10mm from MET to a earth block in the garage. then from the earth block: .1.to CU, .2nd to Gas riser, .3rd to Meter outlet to house, plus the gas pipe at the boiler all ready has 10mm to it .
  9. S

    Main Bonding

    Plus the garage cu !
  10. S

    Main Bonding

    It is a metal gas meter !
  11. S

    Main Bonding

    That is good then so will pull through a the 10mm from the MET to a earthing block in the garage, then 10mm to the CU, outlet pipe of gas meter, and the gas riser , job done !. ps: The difficult part is attaching a bond to the riser, not sure how to go about doing that, would have to be some...
  12. S

    Main Bonding

    NO, it does not have one of those, but it seems that I have to bond to the outlet of the meter and the riser coming into the garage, not sure how I am going attach a bonding to that, any ideas ?.
  13. S

    Main Bonding

    But I thought that the 10mm bonding from the MET to the Meter had to be continuous, if I put in a earthing terminal before the meter it wil have broken the continuous run !
  14. S

    Main Bonding

    The gas pipe riser in the garage is 3/4" bsp steel pipe !
  15. S

    Main Bonding

    That is what I am thinking, yes there is a 4mm cpc to the garage cu
Back
Top