That is kind of my problem, the installers say it's not needed, the project manager is complaining I didn't specify it and the QS we are using is saying it's needed. As I will be the one who is asked "is this ok?" shortly I'm just canvasing opinion.
Thanks
Stevoon
Thanks for the replies
I have tested today to find out the current on the Earth for a PC when plugged in. I have measured 3mA, so on that basis a radial with 6 PC's will have 18mA on it. Am I right that this does need High Integrity Earthing as the total is over 3.5mA or it doesn't as no one...
Hi, no sorry I'm the IT guy so don't have access to the regulations. I had been on site however and spotted they had been ran as a radial in 2.5mm Twin and Earth with no sign of a seperate earth wire. The Electricians I would normally use would of ran this and as the fit out company hadn't I...
I'm in the process of working with an Office Fit out company to build a new office. I have specified that each desk cluster should be its own circuit giving either 4 or 6 PC's per circuit. I'm interested to know based on this information if the Electricians on here would of designed the...
I had a service head replaced by Stormport on behalf of WPD. They included details of the engineers name & mobile number to call them on to arrange the appointment.
Thanks.
The re-roofing is to strip off the old tiles, laths & felt then replace and also new leadwork to the chimney etc.
The property is a 3 Bedroom Bungalow with a Hip & Ridge roof.
Thanks
Stephen
Hi All,
Is there any fundamental issue with getting a house reroofed during the winter as I have been offered a deal to do so now rather than wait for the summer?
Thanks
Stephen
Thanks John. I know my neighbour has PME so I was hoping I can and do away with my Earth Rod as it's not brilliantly installed. I wasn't sure if it was the sort of thing that gets guaranteed if you have the right sort of biscuits on offer so thought I would ask!