Recent content by tangojess

  1. T

    failed structual survey

    Timber battens approx 2 by 2 inches added to the top of each truss, so the roof has gained 2 inches in height. Then you have got the roofing battens running 90 degrees from the added timber with the felt and slates attached. Cheers
  2. T

    failed structual survey

    :( A structual survey has been carried out on my property and the report stated that the raised tie trusses were not sufficient as they have got timber added on top of them to increase the height of the roof. The roof was done before we bought the property and has been up for approx 20 years and...
Back
Top