  1. T

    Opening in Brick Foundation Near the Footing

    The DPC is a few courses of brick further up than the last visible course in the picture. What you see in the picture is only the excavated part below ground level. This opening has dirt on the inside, i.e. there is no cavity or pipe or cable left in there. It was also fully covered in dirt on...
  2. T

    Opening in Brick Foundation Near the Footing

    I was looking for the entry point point of the mains water pipe and was excavating on the exterior of the front brick wall by digging right beside the foundation, and 8 courses of brick below ground level I reached the footing of the foundation. I noticed that in one place on the first course of...