i want a jacuzzi bath put in my bathroom its going on a concrete floor covered in tiles do i need to put a metal mesh on floor under tiles to bond bathroom
CAME OFF BOTH TANK AND CYLINDER WITH COPPER DOWWN TO SHOWER VALVE AND COPPER + FLEXI PIPE FOR SHOWER HEAD ALL PIPES IN LOFT CAN I BOND THEM IN THE LOFT
JUST FITTED JACUSSI BATH TOO DOES THE PUMP NEED TO BE CROSS BONDED
a bit of advise please
i have just installed a concealed thermostatic shower in my bathroom with cold water being supplied from tank in loft also hot water supplied from cylinder in loft pipes for hot and cold in wall in bathroom
do i need to cross bond these pipes in the wall or in the loft...
can anyone advise me
fitted new concealed thermo mixer shower but water pressure rubbish cw from tank hot water from cylinder do i need a booster pump
both tank and cylinder in loft
its a fixed head so need a bit of advise on pumps really