Search results

  1. M

    Regulations

    If I get a new improved JB and link the circuit I'm working on it gives me experience to link all the other lights when I'm ready to do that what is the problem I'm just trying to learn like anyone what's so bad I've draw you a circuit that you said would work if I can draw it I understand it :/
  2. M

    Regulations

    So your saying I don't need a junction box ? The ceiling rose has a live and neutral terminal ?
  3. M

    Regulations

    The live will come from a junction box the ceiling rose don't have the extra terminal to loop the live to the switch ?
  4. M

    Regulations

    Or should I say diverting the live to the switch ?
  5. M

    Regulations

    Sorry switched live then my bad
  6. M

    Regulations

    The ceiling rose won't allow me to split the live so it needs to be split in a junction box and sent to the switch and there ain't any room in the junction box that's already there ?
  7. M

    Regulations

    Because when I've got the 2 way working installed the next project will be to replace the old junction box (birds nest) with a new one mate
  8. M

    Regulations

    Yep only reason for that I don't feel confident trying to use the junction that already there have you seen the photo of it ? Lol
  9. M

    Regulations

    Well the reason I mention the junctionbox is because there are no terminals left on that one so for now my new light circuit is going to come from a new junction box which has per to it from the old one the. That will be the next job to re wire the box I understand where you are coming from all...
  10. M

    Regulations

    What are these called mate and where does the power from fuse box go into that it don't show does it ? Do screwfix/toolstation sell them ? Thanks
  11. M

    Regulations

    Yes Yes this is correct originally I wanted a 2 gang slave upstair too but could not work my bathroom light off it aswell as the landing on the other gang so now I've gone for a single slave for the landing and a single master for the bathroom
  12. M

    Regulations

    This is not possible as the downstairs light requires a master to work and the landing and downstairs is on a 2 gang master the bottom light is 1 way so won't run off the slave which is why I put the slave upstairs for the landing 2way ?
  13. M

    Regulations

    Looks to me like the load has to come from the downstairs master though :/
  14. M

    Regulations

    Is this what you propose ? Done a re-sketch I do appoligise for not listening before I am new to all this and do want to learn from what your saying :)
  15. M

    Regulations

    Sorry didn't see that so the live in and out of the switch can be from the slave sorry so this will save the extra cable going downstairs ? And the junction box was to replace this ill send a picture this is used to loop the live back to switch instead of the ceiling rose/downlights which I...
  16. M

    Regulations

    The master and salve are connected with a 3 core like the Varilight circuit drawing says live, load and link all connected one 3 core cable ? :/
  17. M

    Regulations

    Let me re-word that mate I mean instead of having the junction box I have which looks a mess and all the earths twisted together to hold the top on the box it's self is there a type of junction box made for what it's doing that gives more room to put all the cables in neater and safer and a...
  18. M

    Regulations

    Master is downstairs and slave is upstairs mate ?
  19. M

    Regulations

    Does anyone have a better idea than this circuit/situation ? Any input would be appreciated ?
  20. M

    Regulations

    Where the live is split in the junction box for the switch ? :/ I think lol
Back
Top