Search results

  1. S

    Cracked Brickwork above Kitchen window

    I would do it if I felt more confident about it, never put a lintel in before. Looks like the concensus here is not to let the owner do it, I think my nephew is leaning towards leaving it for time being until he has more funds unless the mortgage provider says it must be done. He also doesn't...
  2. S

    Cracked Brickwork above Kitchen window

    Thanks Stuart.
  3. S

    Surveyors report - Roof structure Issue

    At moment the mortgage people have yet to comment on report.
  4. S

    Surveyors report - Roof structure Issue

    Thanks both of you. I also thought CYA which seems standard for these reports.
  5. S

    Cracked Brickwork above Kitchen window

    Thanks Ivor. My nephew won't have a lot of spare cash after sale as buying on his own which is why I was thinking of asking seller to sort it.
  6. S

    Cracked Brickwork above Kitchen window

    My nephew is purchasing a 1970/80s house of brick block construction and the surveyor has notice some cracking and loose brickwork above the kitchen window and has advised a lintel needs to be introduced. It looks like just two rows of bricks above the window are affected at present. Now i am...
  7. S

    Surveyors report - Roof structure Issue

    Hi All, Hope I am posting this in the correct section. My nephew has just had a survey done on a 1970s/80s house he is purchasing, the house is of brick and block construction with a pitched roof of concrete roof tiles. In the report the following has been mentioned by the surveyor: 'In...
  8. S

    Electric Boiler Question

    The DNO have said an electric boiler install does not have to be notified to them.
  9. S

    Ignore - moved

    .
  10. S

    Electric Boiler Question

    My other son the apprentice electrician saw it.
  11. S

    Electric Boiler Question

    Thanks for the reply ericmark. He's also got an electric car to charge.
  12. S

    Electric Boiler Question

    Thanks Hugh I didn't realise some people had the meter inside like that.
  13. S

    Electric Boiler Question

    Thanks Etaf. I would say little cash to spare. The boiler is the major stumbling block if it needs to come out plus the rest of the speed fit pipework which was likely done by homeowner.
  14. S

    Electric Boiler Question

    I would think a starter home for him for a few years.
  15. S

    Electric Boiler Question

    1970s house. I have asked my nephew to get last winters bills but I don't know if he did or not. No gas meter outside but strangely some old pipes in the downstairs cupboard under stairs that are capped off one has an old lever valve on it so don't know if it did have gas at some point. He...
  16. S

    Electric Boiler Question

    Thanks flameport. I will pass that on to my nephew.
  17. S

    Electric Boiler Question

    Make is strom, I think because the breaker is 63a it will be either 11kw or 14.4kw. I didn't count rads but I think 7 rads is probable.
  18. S

    Electric Boiler Question

    Just done second viewing. 16mm cable feeding boiler in loft with a 63a breaker next to boiler. 63a mcb in fuseboard with main 100a rccb. Incoming Fuse next to outside electric meter is only 60A though.
  19. S

    Electric Boiler Question

    My son reckons its 10mm but I thought it needed to be 16mm
  20. S

    Electric Boiler Question

    Also I'm not sure the cable going in is adequately sized.
Back
Top