Hi All,
I'm planning on opening up the rear of my house and could do with a little advice; I'm exhausting the internet and youtube.
The Structural Engineer has specified a 305x305x118 6.5m long beam bolted to the sides of two 203x203x46 columns (B6, C1 LHS and C1 RHS).
The columns are to...