Search results

  1. T

    bath leg set

    Middle clamp in photograph is set up correctly.uppermost part of clamp (red/part) rests on underside of bath.Bottom red part and rest of clamp go against the wall. Drill wall and fix with bolt through slotted hole using blue rawl plugs and clamp bath to wall with wingnut.Hope this helps. Steve
  2. T

    simple electric shower question

    Yes but you also have to inform building control. Steve
  3. T

    Gas safety check

    Cheers doitall just thought i'd double check no offence but as i said i needed a definative answer. Thanks again Steve
  4. T

    Gas safety check

    Thanks for your help, just checked corgi site new appliances should be safety checked within 12 months of their installation date. Steve
  5. T

    Gas safety check

    Cheers Doitall but i really need a definitive answer,are you an rgi?
  6. T

    Gas safety check

    I am a landlord,aswell as the usual corgi benchmark cert when a boiler is replaced do do i need a full gas safety check aswell? Thanks Steve
  7. T

    Electrical spur extension

    Heaven knows! " But if you're gonna do it, do it right, right?" :D
  8. T

    Electrical spur extension

    Because 2.5mm can take 27A, i know a dso is max 26A and then an allowance for diversity can be made but; Best practise if your "spurring at the mcb" is to assume that someone will convert it to a radial circuit in the future, so larger cable is better. Steve
  9. T

    Electrical spur extension

    Stefan plant I your still following this thread and you still wish to run the new circuit from the cu from a ring final (ie 32A mcb protection) i would run it in 4mm. Steve
  10. T

    Electrical spur extension

    Securespark I stand corrected if its a ring final :oops: I know its frequently seen but not best practice. Steve
  11. T

    Electrical spur extension

    reg 314-01-04 Its two individual circuits!
  12. T

    Electrical spur extension

    No! Where an installation comprises more than one final circuit,each final circuit shall be connected to a separate way in a distribution board. The wiring of each final circuit shall be electrically seperate from that of every other final circuit, so as to prevent the indirect energising of...
  13. T

    Shower advice

    Mira magna, bit pricey but superb performance.Handy being able to hide digital mixer outside bathroom ie loft, airing cupboard. steve
  14. T

    Is this a TT Supply ?

    tns :shock:
  15. T

    rising water in F & E tank, rising blood pressure too

    Had a similar fault once with copper pipes (heating/hot water) buried in concrete floor, pipes had fractured and allowed the c/w cistern to fill the f/e tank!
  16. T

    baxi 80 eco hot water problem.

    I would hope he's not missed something as simple as that looking at the gas cert he's done recently operating pressure of living room fire is 17mb
  17. T

    baxi 80 eco hot water problem.

    Please help boiler fitted approx 3 years ago. central heating ok hot water very poor,heating engineer has replaced several parts-plate heat exchanger,thermistor, complete divertor assembly and finally a new gas valve. He's now thrown the towel in saying he can't adjust gas valve past 5mb...
Back
Top