We have a problem with our Y plan heating, the programmer is a Honeywell ST699, running a Main 24 Heat ERP boiler.
The 3 port valve which had been sticking was replaced spring 2025 with a ESI 3 port Zone.
The heating will work by itself as will the hot water.
But using the 2 timer period the...