    You seem to be missing the point all I am after is a view of the excavation costs nothing more nothing less
  2. B

    Drainage work

    I continued to ask how much it was going to cost but never got anywhere until the bill landed. This was being done whilst they worked on the main foundation digging. My main issue is the length of time to dig that trench I need to understand whether it is reasonable, as from looking at the size...
  3. B

    Drainage work

    Hi all, I'm currently having an extension built and seven Trent insisted on us putting in an inspection chamber and to divert the foul pipes to the outside of the building. The drains were uncovered as part of the main foundation excavation but they did have to dig a 2m long by 0.6m wide and 1m...