Search results

  1. F

    Building work started

    Hi all. I have been granted planning and works have started. The planner rejected plans that the side extension bridge line be 350mm lower than existing and the front be stepped back a brick. The builders have built up to damp at the front and its flush with existing house. Building inspector...
Back
Top