Search results

  1. S

    Y plan component placement.

    Great info there, thankyou. The pump can go on either flow or return as space allows for this in the vicinity of the boiler.
  2. S

    Plastic oil tank outlet fitting

    Hi all, I have a plastic oil tank with the standard short outlet , I think its a 1inch female thread . Anyhow, the atkinson tm. Won't fit that so I have the adapter tube. Question, Can I unscrew the metal coupler out from the tank and screw in my new adapter in its place ? Then the atkinson...
  3. S

    Y plan component placement.

    Sounds like the return near the boiler may be the best place for the pump and then the diverter valve would go in the loft ( I take it diverter is same as motorised valve ). The feed and expansion can go near the motorised valve , How far apart do the feed and expansion "T" have to be ? or...
  4. S

    Y plan component placement.

    Having had more of a think over the weekend I am wondering if a better placement for the pump would be next to the boiler, and in which case on the flow or return side ? Thanks for any advice .
  5. S

    Y plan component placement.

    That is correct, Boiler and cylinder are opposite each other at a distance of approx 3 metres, so the pipework will go up into the loft for connections.
  6. S

    Y plan component placement.

    Sounds good, I can elevate the feed expansion tank so it is approx 1.3 metre above the pump. This will place the tank approx 1.2 metres above the top of highest radiator . The pump will sit at approx 40cm (at same elevation with M. Valve) below top of highest radiator. 2 Metres below this on...
  7. S

    Y plan component placement.

    Hello and thanks. The F/E tank will be the highest part of the system. Sorry, I possibly didn't make that clear earlier.
  8. S

    Y plan component placement.

    Thanks for the help guys. It will be an F/E Tank about one meter above the upstairs radiators. The boiler will be opposite the cylinder so the pipework will go from those up into the loft where the pump and mot. Valve will be. It's just so much neater doing it that way and plenty of room for...
  9. S

    Y plan component placement.

    Hello all. Background... I am a 56 year old guy working on a 400 year old property which I have recently inherited from an Uncle. Many years ago I trained as an electrician and also have done many plumbing jobs including full CH systems. Currently I am installing a Y plan system into my...
Back
Top