Search results

  1. S

    Heat or Smoke detector for Kitchen

    In Scotland, for newbuilds and building warrant jobs, heat alarms in kitchens are required
  2. S

    NICEIC & SELECT

    It's a question I'd like the answer to myself, as you point out 'statutory' and 'guidance' are contradictory terms and as things stand it looks like I will have to have to register with a scam (NICEIC) which I am not happy about!
  3. S

    NICEIC & SELECT

    Since December, to comply with 'statutory guidance' EICR's are required 5-yearly for rental properties (next December for existing leases) and must be done by NICEIC/SELECT registered electricians or someone who can complete the checklist on page 13 here...
  4. S

    Kichen and Bathroom DISASTER

    Sounds like you've paid for a good quality job and been screwed :( Did you get a written quote? or estimate? (what does it say)? Does the Builder have any terms & conditions (what do they say)? £12k is rather high for a normal kitchen deposit. How much are you still owe them/would be owe them...
  5. S

    Making commission on leads

    You don't make commission on passing on someone's contact details (leads) unless you're a scum sucking leech. I have no problem paying or charging a little commission on actual work.
  6. S

    EICR follow up

    Don't ask anyone whose name is on the EICR for a recommendation for another electrician, the name(s) are just the electrician (and their supervisor if 2 names). I would think the estate agent should be happy to refund the cost (which was?) on the basis that you wont pursue them and their...
  7. S

    EICR follow up

    WOW, that has to be the worst EICR ever! shocking! you were charged for that? (how much?) Is the 'electrician' a member of an approved scheme? (NICEIC etc?)
  8. S

    Lampholder: earthed metal or non-earthed plastic - which is safer ?

    metal lampholder but i'd go for at least 0.75 cable...more mechanically sound. a small amount of silicone in the base hole should provide a bit of strain relief but still allow rewiring again in future if needed
  9. S

    RCD required?

    The very point of replacing the CU in most cases is to bring that part of the installation up to current standards. It's not the complete circuits you're necessarily making fully compliant, it's the circuit protection. As stillp said and eric alluded to the risk of more frequent tripping and...
  10. S

    RCD required?

    You're installing a CU. You install it to the latest version of the regs. If you connect a circuit which should be RCD protected and you don't RCD protect it, your CU installation is not in compliance with '7671 (note a departure on the EIC, quote/estimate for fault finding/repair/issue warning...
  11. S

    RCD required?

    With 17th amd3 CD rules for concealed cable are now the same for commercial as domestic "It is now required to protect cables concealed in a wall or partition (at a depth of less than 50 mm) by a 30 mA RCD for ***all installations*** if other methods of protection, including the use of cables...
  12. S

    What can I do myself in Scotland?

    Common on cookers but i've never seen a gas HOB that had a user demountable (bayonet) connection.
  13. S

    What can I do myself in Scotland?

    The 'socket' is probably a cooker outlet plate It would almost certainly be cheaper to employ a gas man to fit a new hob rather than paying over the odds for cooking on an electric hob You don't have to use an electrician but given your lack of basic electrical knowledge I'd certainly recommend it
  14. S

    What can I do myself in Scotland?

    Is this socket 'under the sink' the same one that is actually a 'cover plate over a box' and controlled by the cooker switch? If it is and it's on one of the 30amp fuses, it'll probably be fine to connect a 6kw hob to but that should be confirmed by a competent electrician (earth loop impedance...
  15. S

    pm'd you

    pm'd you
  16. S

    At my wits end on how to get a quote?

    oh, hi, just saw your message on my profile page, have pm'd you now
  17. S

    Damage classification

    True, if the existing floor was to be retained, work shouldn't have started until it was protected (or else you'd just be asking for trouble!). The plasterer's mess does look bad, but I've yet to meet one who doesn't make any mess (eg floor splatter). The stairs are new and from the same job...
  18. S

    Damage classification

    The contract apparently says client is responsible for floor protection (post no15), although it seems the client (OP) didn't actually read the contract/terms until after the work was carried out. Personally I always quote to protect everything and build in a contingency for possible forseeable...
  19. S

    A Safer System than having a Service Line fused at 800amp in your house!

    Not really, try reading the post above yours
  20. S

    Mains smoke and heat detectors

    Minimum CSA of 1mm is given for power circuits in red book 17th edition 2008 (p105 table 52.3) so I think it came in with amd1 to the 17th as I don't think it's new with amd2?
Back
Top