I'm planning on relocating the pipes for radiators 1 & 2 to make way for a steel beam. Radiators 1 & 2 will branch off the main flow and return between radiators 3 & 4. I noticed the flow & return leave the boiler in 22mm copper and steps down to 15mm copper before the first radiator, this then...