Search results

  1. P

    Ze

    Ze test should be done with the earthing conductor disconnected. Zs should be done with the main bonding and equal-potential bonding conductor disconnected. so as to remove parallel paths. Ze TT SYSTEAMS 21 ohms TN-C-S 0,35ohms TN-S 0,8 ohms
Back
Top