Is the wiring run in metal conduit ?If so that will have been used as an earth .If the conduit is an earth run an earth cable from the swith to the metel backing box
They'll be testing when its finished,as long as its been installed correctly and ran in safe zones then it should be ok.Have you reason to think there may be an issue?