Search results

  1. M

    tighen valve on heated towel rail

    Hi I am fitting a heated towel rail in my bathroom but don't have the right tool to tighen the valve insert bit into the radiator. it looks like i need a large allen key to tighen it up. Does anyone know the size allen key that is needed? Thanks M
  2. M

    Help with pipe layouts

    I'm going to get the boiler fitter to run the cold to the boiler so i don't know what size this will be but i guess its 22mm? if its only a 1 story house do i still need to do fire boarding under the stairs? in advice with the soil pipe? can i run the main pipe to the toilet and T the...
  3. M

    Help with pipe layouts

    The gas fitter is coming next week to look at putting the boiler under the stairs. its a really big cupboard (big enough to stand up in etc. Is this likely to be an issue? what sort of things need to be taken into considetration to have a boiler under the stairs? Thanks M
  4. M

    Help with pipe layouts

    Thanks Joist run top to bottom of picture and the outside walls are on the right and on the bottom, the soil pipe shown runs down the outside of the wall on the bottom M
  5. M

    Help with pipe layouts

    Can anyone please comment on my suggested hot water layout? the combi boiler is to be placed in a cupboard under the stairs so i will be running the pipes to the landing then down to the cupboard. Is it correct to assume that 15mm pipe should be used for of these water pipes? Also can...
  6. Untitled

    Untitled

  7. bathroom

    bathroom

Back
Top