  1. pompeyal

    16 day bathroom project

    Continuation..... I had the floor covering laid professionally with vinyl... And then fiited the sink and WC.... I have other pictures but too many to include... tonight the towel heater will be fitted and then its finished...
  2. pompeyal

    16 day bathroom project

    Yes, the whole floor is fitted out with water resistant chip board.
  3. pompeyal

    16 day bathroom project

    After moving into my house 2 years ago it was about time I dealt with my bathroom, the original room had a bath with a shower over and an awful curtain track around, the sink was located in a recess which was of good quality also the mixer. the shower mixer was of the same quality also and the...
  4. Built up run off for shower recess

    Built up run off for shower recess

  5. Flooring over heating pipes

    Flooring over heating pipes

  6. Cutting out the stud wall for main shower head

    Cutting out the stud wall for main shower head

  7. New piework for the sink

    New piework for the sink

  8. Re directing the heating pipework

    Re directing the heating pipework

  9. Tiling around stink pipe enclosure

    Tiling around stink pipe enclosure

  10. Professionally laid floor covering 2

    Professionally laid floor covering 2

  11. Professionally laid floor covering

    Professionally laid floor covering

  12. Mirror over sink & shower head

    Mirror over sink & shower head

  13. Shower cubical completed

    Shower cubical completed

  14. Tiles after grouting

    Tiles after grouting

  15. Supporting tiles over the window 2

    Supporting tiles over the window 2

  16. supporting tiles over the window

    supporting tiles over the window

  17. Fitting tiles over shower mixer

    Fitting tiles over shower mixer

  18. Fitting the tiles

    Fitting the tiles

  19. Shower tray waste

    Shower tray waste

  20. Fitting floor over pipes

    Fitting floor over pipes