Search results

  1. Untitled

    Untitled

  2. B

    architect or builder at fault?

    surely the minimum would be for the step to reach the door :lol: the last step onto that slab is an ankle breaker. and this is all on top of the soaking floor ,sealed drainage, gap in the door and now abortion of internal finish (which the drawings state should be taped and filled...
  3. B

    architect or builder at fault?

    surely the building regs have to be adhered to ? i cant fit a boiler in an unsafe postion because the drawings say so
  4. Untitled

    Untitled

  5. Untitled

    Untitled

  6. B

    architect or builder at fault?

    Lose, Lose for me then. Said he'll take 1800 off to let me get it fixed myself
  7. Untitled

    Untitled

  8. Untitled

    Untitled

  9. Untitled

    Untitled

  10. Untitled

    Untitled

  11. Untitled

    Untitled

  12. B

    architect or builder at fault?

    The builder measured and gave me a quote for the work before the drawing was done. That is why i am asking who is at fault. I would assume however he would have to build them to regs. Look at the finish "would you be happy with that ?"
  13. B

    architect or builder at fault?

    Poor workmanship in my opinion. They were out the first time and sealed external Windows (drainage) I had to point that out to them. The internal chipboard was touching the external brick. No gap or dp. They've now came out, cut the board back and put plastic in but they've had to take the...
  14. Untitled

    Untitled

  15. Untitled

    Untitled

  16. Untitled

    Untitled

  17. Untitled

    Untitled

Back
Top