Get some spreader plates for both internal and external. Drill them off. Apply some from of sealant under both plates.
Then fasten all together. I wouldn't use pop rivets. I'd get some m3/m4 stainless flange dome head bolts and nylock nuts.
If you haven't got the correct grip length rivet you...
Spent about 4 hours today shuttering.
Had to cut my stakes all by hand. Saw is about shagged too so was hard work. Need to invest in a chop saw before I start building.
34 in total.
Started the shuttering at the shallowest end. Got 1 long side and 1 short side in before the crushed brick...
Yes you are right big-all, that why I am trying to give as much info I can, including costs, to help the best I can.
I wish more people would include a few of the smaller details in their posts.
A boring update:
I had a delivery from my local building merchants today.
I ordered some timber and soft sand.
2off 8'x4' sheets of 11mm OSB ripped down to 300mm. This will form the edges of my shuttering for the base.
5off cheap 4.8m lengths of 3x2 for stakes. Going to put them at close...
not sure on your circumstances or restrictrions but looks like your ridge is already set from the first picture.
could you dow something like this to get a greater fall?
may not be possible but its a thought
My friend at work put electric ufh in an en suite and he said his monthly bill was roughly £30 a month more in colder months with it running. This is due to it just taking the chill off the floor and not heating the room. I have looked at the low profile retro fit wet systems. Claimed to be an...
I’ll be hiring a whacker plate. Type 1 kind of stuff. Or more likely crushed brick. Concrete slab to go on top for timber framed work shop. Would you recommend more than 2 layers then?