Thanks for your help
Customer wants all pipe to be hidden, pipe runs per floor are no more than 10 mts per rad per floor.
Idea was to have a bank of manifolds on each floor connected to the three port via 22mm pipe work. The only single rad over 10,000 btu is on the ground floor I can run...