    35mm check valves

    Hi guys do any of you use 35mm check valves and where do you find best suppliers and prices ?
  2. A

    2 gloworm boilers in parallel both producing fault codes f25

    Hi Agile- Would i need 1 or 2 motorised valves and where would you advise i put them ? Im assuming i couldn't mount them in the 35mm pipework could i ? The pump that is their at the moment is controlled by both boilers and has an overrun of 5 minutes could i link the valves with...
  3. A

    2 gloworm boilers in parallel both producing fault codes f25

    HI Lcgs- The plumber said when he did the calcs it came out at 50 kw. Can you enlighten me to what a robo kit is. We have got at least 6 sytems we have installed exactly the same and never had problems with also running with 15/60 pump. Just like to add the plumber chooses the boilers and...
  4. A

    2 gloworm boilers in parallel both producing fault codes f25

    Hi Agile- I asked the owner of the house which is at the moment a 5 bed detached property what he had planning permision for and he said it would it would end up being 9 bedrooms . I will ask the plumber to check calcs like you suggested. Who do you use for reasonable priced check valves ?
  5. A

    2 gloworm boilers in parallel both producing fault codes f25

    Thanks we were intending replacing the alpha with a light comercial that we have allready. and we were thinking of using the alpha as a shunt pump.
  6. A

    2 gloworm boilers in parallel both producing fault codes f25

    Hi Lcgs thanks for your help, i have now loaded the pictures that people have been asking for , what are your thoughts on the low loss header. If we fit 1 we may make it ourselves but we would need to know the dimensions i have downloaded the diagram off the Kelston site but i dont know if this...
  7. A

    2 gloworm boilers in parallel both producing fault codes f25

    Hi lcgs have you got a better copy of the diagram because it is very faint and when i zoom in it goes blury. Can you tell me how to post pics from the album in my profile because i have 5 pictures of the system.
  8. A

    2 gloworm boilers in parallel both producing fault codes f25

    HI Agile i have updated the thread to try and give more accurate info i dont know about the megaflow / 60kw equation im just writing down what the parts in the system are. I couldnt isolate boiler as you sujested because their are no isolating valves above the boilers. I spoke to the plumber...
  9. A

    2 gloworm boilers in parallel both producing fault codes f25

    Tried to add pics tothe post they were showing when i typed it up but will not show with the text anyone know what im doing wrong ?
  10. A

    2 gloworm boilers in parallel both producing fault codes f25

    Hi everyone been to the site today to take pictures. I also got pipe size wrong flow from boilers to pump=35mm then under floorboards to ground and first floor=28mm. If you can see pics flow comes out of left hand boiler and picks up flow from right hand boiler on its way to the pump. Boilers...
  11. Untitled

    Untitled

  12. Untitled

    Untitled

  13. Untitled

    Untitled

  14. Untitled

    Untitled

  15. Untitled

    Untitled

  16. boilersx2

    boilersx2

  17. A

    2 gloworm boilers in parallel both producing fault codes f25

    Thanks for all the input were trying to get the most cost effective solution to make the system work properly. I will try and get pics asap thanks for being patient.
  18. A

    2 gloworm boilers in parallel both producing fault codes f25

    I have just checked the spec on the pump and it is 1.3m3h-2.7m3h If we fitted a shunt pump would we fit it in plsce of the auto bypass valve or as well as.
  19. A

    2 gloworm boilers in parallel both producing fault codes f25

    HI Loony i have adjusted the output of the boilers in the software. Their is also a megaflow just next to the boilers i think this is connected to the 35mm primaries. I think he didnt run 35mm under boards because of the amount of timber he would have had to cut out of the joists, The system on...
  20. A

    2 gloworm boilers in parallel both producing fault codes f25

    35mm just from the boilers to the floor then 22mm. The primaries are as you described although flow and returns are equal lengths. Could i lower the return temprature by icreasing the differential ? I have also got the return stat on the sequencer set at 50c which will hold the lag boiler off...