Search results

  1. S

    Rewire cost

    It's impossible to quote. Location has some impact, but there are so many other factors (number of circuits, will the property be occupied, how many estimated days and so on) that affect the price. As advised get another couple of quotes.
  2. S

    3ph to Single Phase

    I was thinking more about a council employing an electrician who would split the ring the way he did. I wonder what he was thinking. Did you ask him?
  3. S

    3ph to Single Phase

    which council owned theatre was this?
  4. S

    MK Logic Plus Rapid Fix Sockets (built in "Wagos")

    What are the disadvantages, and are these just your uncertainties. As John has posted, the technology has been around for decades.
  5. S

    MK Logic Plus Rapid Fix Sockets (built in "Wagos")

    The advantage I see is that it gives a consistent connection, with less conductor deformity. I have not had any issues with wago clamps, so would not expect any with this socket. It will be interesting to see if : - there is a market for the product - how MK develop other products in the...
  6. S

    Is this a new circuit?

    This feels like we are back in 2005, looking for ways to get around notifying LABC. The fact you are reusing the MCB and cable is irrelevant. It's a new circuit supplying a cooker. The existing circuit was installed to supply a shower. This is just my opinion.
  7. S

    Electrician not providing certificate for new circuit

    Any installation job requires certification. This confirms the job complies with BS7671. If the job also requires BC notification, the compliance process has to be followed. To my mind this is common sense, not just blindly following rules. If the ‘electrician’ doesn’t provide the certs, he...
  8. S

    Electrician not providing certificate for new circuit

    I believe the term is cowboy. Do you mean that following the rules to design/install/test and certify that the work complies with the BS7671 (and with Building Regulations) is just unnecessary bureaucracy?
  9. S

    V2L

    Have you ever handled live 55V ac circuits, by that I mean stripping cables and terminating them live? Read more: https://www.diynot.com/diy/threads/v2l.582087/page-4#ixzz7E6S33UWt I don't work live at any voltage. A friend of mine lost an eye when he shorted a car battery and he was hit by...
  10. S

    V2L

    Hi John. I think 'black sheep' is a bit strong, implying that there is malice in play when a mistake is made. I never stated, nor implied, that everybody involved in the electrical installation industry was perfect. My post came after seeing the following posts: #26 Sunray Sadly far too...
  11. S

    And they want us to use electric cars, but 9,000 with no power!

    Do you really think tree planting is a bad thing?
  12. S

    V2L

    I’m just curious whether you guys believe any electrician, IET member, CPS member/assessor, HSE inspector is competent enough to work in the industry. If we were as bad as made out here, the UK would be a death trap.
  13. S

    Saniflo Cable too short for Spur.

    Why don’t you just fit an FCU with a flex outlet lower down the wall and remove the FCU from up top?
  14. S

    Saniflo Cable too short for Spur.

    is the cable for the FCU run from floor level, up or down from the ceiling? What purpose does the FCU serve?
  15. S

    Saniflo Cable too short for Spur.

    Why is the FCU up that high? Where is the cable run? Where do you plan to fit the macerator?
  16. S

    And they want us to use electric cars, but 9,000 with no power!

    We had fuel supply problems a few weeks ago, so there were people who couldn't get warm in their cars
  17. S

    Outside light from a spur socket

    It's as clear as day.
  18. S

    Wiring an induction hob and two ovens on a single cooker circuit

    Just checked and it was still in effect until mid 2008. Apologies to Sunray.
  19. S

    Wiring an induction hob and two ovens on a single cooker circuit

    Indeed. In a later post he referred to the brown cover in 2008. The last brown copy I recall was the 16th edition 2001. Out of date by 2008. I don’t come across any of the installations which are seconds from total failure he faces on every job. Then again up here we don’t see many AV...
  20. S

    Wiring an induction hob and two ovens on a single cooker circuit

    How did you get the homeowner to accept the cost of notifying for this new circuit? Given you don’t have current regs, what do you test against?
Back