Is it still classed as outside of the zones (0, 1 and 2) (i.e. over 600 mm from bath/shower
If you were to position a boiler at the foot off the bath over 600mm from the end off the bath, but were the bath as a shower over it as the screen doesn't extend all the way around the showering area.