Search results

  1. N

    Message to noseall

    The original builder!!! got the push after the foundations were finished as we were quite worried at the time that he wasnt competent. We went on to iron out a few mistakes ie; every single underground pipe being smashed being one... We have now unearthed this major problem and are trying to...
  2. N

    Message to noseall

    yes I can here where u are comming from and it does feel to be getting messy. We shall have to wait for structual eng to come home. Thanks for your help
  3. N

    Message to noseall

    heres the picture
  4. N

    Message to noseall

    Hi I have put a picture of our steel plan on our website and would be grateful if u could have a look. link removed and steels link is shown at the top of home page. The nib on left of picture was (as far as we can tell) not going to be used to support the beam 4 above and a column has been...
  5. N

    problem with footings

    Hi Our footings were built as per plans, 450 by 1 metre deep but the problem is that the water table here is high and most of the time the footing will be sitting in water. The steel column is supposed to be placed on top of the footings but if we do this then the base of the column will also...
  6. N

    problem with footings

    Me again Footins are 450 wide and we used concrete and trench blocks
  7. N

    problem with footings

    Hi sorry i wasnt clearer. We had a nib on original drawings which was built on top of the footings. We have removed the nib and have been told to set the new column 100mm into block wall. By doing this we should have enough footing to support the column. Q1.. The column is going in at the edge...
  8. N

    problem with footings

    Hi all We are in the process of building a 2 story extension and have come to the stage of putting in the steels. 1 of our steels is going to be Vertical and we forgot about this and after footings were finished (450 wide by 1 metre deep) we laid the garage floor slab. The asseser came and...
  9. N

    1st floor timbers

    Our 2 steels run the opposite way to the floor joists
  10. N

    1st floor timbers

    so the masonary will need to go up a level????
  11. N

    1st floor timbers question

    Thanks I think that may work as the WC pipe drops quite considerably and there looks to be room to make it higher. Nelliedee
  12. N

    1st floor timbers

    Thank you for the link. Our joists are above the steels on the plans, directly above. I have the steels being installed next week. I imagine that is in line with existing floor level of our house. If we install the joists at the same level as the steels, we will then be below existing floor...
  13. N

    1st floor timbers

    Yes I am going to ask them but I thought I 'de ask here first as sometimes we get it wrong and ask silly questions.. The plans show the 1st floor timbers directly on top of rsj's. The 1st floor is having to be built 1 meter in from the boundry wall. Ground floor is a wider building. I have...
  14. N

    1st floor timbers question

    it does exit at about 4" above floor level and then it falls towards the main soil pipe. The fall, makes 3/4 of the pipe, run along where new joists would sit.
  15. N

    1st floor timbers

    Hi We are currently building a 2 story extension and have just finished ground floor and are awaiting the steels to be installed. Our Brickies finished work last week and said to give them a call when steels and 1st floor timbers are in. Problem is that there is no external wall to fix joist...
  16. N

    1st floor timbers question

    We cannot move the toilet, the only alternative I can think of is Lowering the WC pipe by 6 inches and it will then protrude into the downstairs kitchen ceiling area. Rather than box it in, maybe we could put a lowered ceiling in later on. It's such a pain. does anyone know what the maximum...
  17. N

    1st floor timbers question

    Hi We are currently building a 2 story extension and have hit a problem with the first floor timbers, Our WC pipe runs 7 foot along the wall and joins the main soil pipe. The 7ft of pipe is smack bang in the way of the new Joists. I have been told that we could put trimmers in, but surely 7ft...
  18. N

    Need a quote for New pitched roof

    not after price on forum, after a roofer to come here and quote
  19. N

    Need a quote for New pitched roof

    Hi all We are looking for a quote for a new pitched roof on our 1930 semi that is being extended at the moment. Also need the pitching done at the front, sides and back Nelliedee Sorry forgot to say we are in Epsom Surrey
  20. N

    How much will this extension cost?

    Our extension is up to 1st floor timbers and has so far cost 9k with labour and materials. Brickie and labourer are £250 a day. :)
Back