Search results

  1. M

    EPS board for floor build up for UFH

    I am looking to back fill a floor ready for UFH. Currently the floor is suspended, removing this will leave a 400mm gap to back fill. There is a dry concrete slab at the base in good condition. Typically it looks like I should do the following: Hardcore Sand DPM Concrete Slab Insulation UFH...
Back
Top