Search results

  1. B

    Help needed with pressure rises in boiler and assorted issue

    New Worcester boiler fitted in January and after about 3 weeks the pressure had risen and the upstairs rads need bleeding. Have now had to do this 3 times. Some of the origonal pipework was 8mm(?) and they have simply inserted and soldered this straight into 10mm(?) pipe in places without using...
Back
Top