Hi. I am going to be extending my bathroom to include a bath. The problem is it is solid floors, and I have to run a pipe from a vertical soil pipe with my outlet at floor level with a 3.5 meter run(and three swept bends) to the bath. I know I need a minimum of 18mm gradient a meter for the...