Am I right in thinking that a bathroom with only a pull cord lightswitch (and centre light) DOES NOT REQUIRE any further bonding. The bonding in effect being supplied by the protective conductors feeding the switch and light point.
Looking at an earlier thread, is PROSPECTIVE SHORT CIRCUIT CURRENT abbreviated to PSCC (this would make sense!) or PSSC as on my Test Certificate Results Schedule (or is my Test sheet wrong?)