Search results

  1. O

    DPM placement

    Aaah, that's great Woody, much clearer, thanks a million
  2. O

    DPM placement

    Ok, thanks Woody, I think that makes sense..so I run the DPM up to the joists keeping it tight, THEN I build my frame..no need to tack it to the frame itself?
  3. O

    DPM placement

    Hi all, I'm converting an old wood storage shed (5x3mtr) into a workshop and I need some advice. The existing shed is single leaf block. There is no DPC and currently a hardcore floor. It's been up for a long time and while it seems sturdy enough, I would rather not go hammering or even...
Back
Top