Search results

  1. R

    Engineered wood flooring put down too early over screed

    Thanks Andy appreciate it. What are the potential things I should be looking out for? Thanks.
  2. R

    Engineered wood flooring put down too early over screed

    Hi all, Long time lurker, first time poster here. Need some advice please. We recently had around 45mm of CemFloor screed put down on Wet UFH. We then went away for a week and when we came back we saw that the engineered wood had already been put down with a thin perforated underlay with...
Back
Top