    The UK is the only country I‘m aware of that type tests DIN rail CUs together with the MCBs, bus bars, etc.. Everywhere else in Europe the enclosure and contents are separate. Only the devices and bus bars need to be compatible. I was once sold Eaton MCBs and RCDs together with a Hager enclosure...
  2. R

    Pull cord switch, no L1 or COM

    It has to be both. Every switch is rated for a maximum operating voltage (and current of course).
  3. R

    Pull cord switch, no L1 or COM

    They seem to be similar to Wago lighting connectors so they could well be.
  4. R

    Plug tops / Plug caps?

    The ones melting metal (or glass) are called furnaces too, the ones generating steam for heating homes seem to be called boilers. At least that’s what I‘ve gathered from decades of reading US books and DIY forum posts.
  5. R

    Plug tops / Plug caps?

    I‘ve been told furnaces in the US heat air while boilers heat water.
  6. R

    Low L–N insulation readings on ring final – normal?

    Well, in that case the tester can’t see anything once the switch is off.
  7. R

    Ceiling electrical boxes for fixtures from North America to France

    If you really want the light to comply with French standards you‘d most likely have to rewire it and replace all the sockets, which requires thread adaptors because NA sockets have a UNC mounting thread while European ones are M10 fine thread. As I‘ve written before, ES27 Lamps do fit ES26...
  8. R

    Low L–N insulation readings on ring final – normal?

    By socket switch, do you mean the switches built into the sockets or the MCBs for the socket circuits in the consumer unit?
  9. R

    Advisory after new shower fitted

    In post #14 OP stated that the EFLI in the 2021 EICR was 0.9 Ohms. That’s within limits but feels high for a 40 A circuit in a domestic TN-C-S installation. Does the EICR mention EFLI at the consumer unit?
  10. R

    Fixing TT earthing problems and gas bonding for an EV charger

    Surely unsatisfactory but functional bonding would be a C2 considering it would only be dangerous if two faults were to occur (bonding conductor disconnected and a fault introducing voltage to the pipework)?
  11. R

    Fixing TT earthing problems and gas bonding for an EV charger

    Loss of PEN in three-phase distribution also means floating neutral, i.e. multiple single-phase installations are effectively connected in series between two phases, which can cause line voltage to go close to 400 V. I‘ve seen that happen in a building with a three-phase TT supply, the neutral...
  12. R

    Advisory after new shower fitted

    A reading over 2 Ohms on a supply like yours (called TN) would point towards an iffy connection, which could be a fire risk. If there was no RCD it could also pose a risk of electric shock in case of an earth fault. And yes, the EICR should list EFLI readings for each circuit.
  13. R

    Fixing TT earthing problems and gas bonding for an EV charger

    TN-C-S only means the PEN is earthed and at some point split into a neutral and CPC. In theory, the PEN could be earthed only once, at the transformer. The huge advantage of TN over TT is the extremely low fault impedance and the advantage of TN-C (-S) over TN-S is cost savings. Only having to...
  14. R

    RCD tripping on a light circuit

    Does each light have one cable going into that connector box like the one in your picture or do some have two? If some have two you could start disconnecting one of them to see if some lights can be turned on.
  15. R

    Operation of a motobike lift table.

    There are plenty of 230 V relays, no need for (extra) low voltage. L to key switch, from key switch to A1 terminal of the relay, neutral to A2.
  16. R

    Operation of a motobike lift table.

    Can’t you simply connect the mains feed via a key switch?
  17. R

    Ceiling Rose Headache

    OP wrote about „a neutral that’s not in use“, I‘d read that as „a spare blue wire“. That would make three T&Es. Maybe the feed goes to the switch, one T&E with permanent live and neutral from the switch to the light and another T&E with switched live and an unused blue core from the switch to...
  18. R

    Ceiling Rose Headache

    There’s three cables. Two lives, two neutrals, switched live and an unused blue wire. Nothing particularly puzzling. I‘d put the unused blue into the connector and the lives into the loop terminal.
  19. R

    Oil radiator down

    You just need to find a way to crimp the fuse, it won’t like being soldered.
  20. R

    Oil radiator down

    Looks like 110C but quite difficult to read.