Hi.
I'm digging some footings for a two-storey extension. BCO, is happy with an 800 mim depth as we are on to sand, but the water table is only 600 mm down so it leaves 200 mm of water on top of the sand.
This will obviously get pumped out before we pour the concrete footings, but with all the...